Preliminary Project Engineering:
Together with our partner Weinmann we prepare a planning layout with the ideal project size. Our competent partnership ensures that you will receive the technological advantage of the automated mechanical engineering as well as realistic and functional operating procedures and material logistics. The general concept includes the following points:
 Facility and capacity plan
 Processing and manual machinery
 Extraction and compressed air
 Material logistics, stockyard
 Staff requirements
This collectively results in a coherent planning, guaranteeing that the highly aimed targets are met.
Existing Production Facilities
We jointly develop a suitable layout design. Under consideration of existing halls and buildings we will plan the optimum of possibilities regarding plant equipment, employees and material logistics. With the approach of an independently observing expert we analyse your existing work structure and optimise the construction sector of the entire production process. These modification measures will increase your effectiveness to a maximum. Our aim is therefore: Reaching the best possible target with a minimal amount of effort!
You can rely on our experience and know-how.
New Production Facilities
The identification of the chosen production size for the house production on the basis of a feasibility study of various planning concepts will take place. Next to potential market opportunities these measures allow specifically the lot size dependent cost optimisation.
Experience shows that a new facility concept guarantees a higher capacity utilisation of the used resources especially the system engineering, employees and capital. The advantage is obvious: Operations do not need to be adapted to an existing building with a high expenditure but can be realised by functional hall architecture and an optimum set-up design.
In combination with the potential automation possibilities of Weinmann we can realise a very economic production concept which is otherwise unachievable worldwide. The complete facility design, the installation and assembly up to the handover to the customer is coordinated and implemented through one contact partner.
This is the ideal symbiosis for every client: Competent technical advice and the security that the deployed capital is returned in a pre-planned period with a reasonable yield.
Project Examples:
Construction of a new production site
Construction of a new production site
Construction of a new production site
Modernising an existing production site
Modernising an existing production site
Modernising an existing production site
CAD-Pre-Planning
Preliminary Project Engineering
HEYNET-COMPUTER